Bulk or bags?
Bulk orders use a selling increment and price per cubic yard. Bags need the product’s yield per bag and bag price. This planner currently supports bulk by volume.
GRAVEL CALCULATOR · PROJECT PLANNER
Measure your project, plan your order and see what you still need to confirm with your supplier.
Enter Your MeasurementsFree to use · No account or email required
YOUR PROJECT
Start with what you know. Any missing supplier details remain visible so you know what to confirm.
Measure the rectangular project area in feet. Enter depth in inches.
Measure the distance along the project area in feet.
Measure across the project area in feet.
Enter the finished depth you want for the gravel layer, in inches.
Measured Volume
yd³
Calculated from your measurements—not the quantity to order
ft³ m³
Add extra material only when your plan calls for it. The default is 0%. Extra allowance is separate from a loose-to-finished adjustment.
No loose-to-finished adjustment applied. This is separate from extra allowance; no supplier factor is assumed.
There is no universal factor. Ask your supplier or check the product information for your material and finished condition. The factor multiplies volume after extra allowance to estimate loose material.
Enter a multiplier of 1 or more, not a percentage. No factor is assumed.
Planning Volume
yd³
ft³ · m³
Planning Volume includes only the choices you made before supplier rounding.
Review planning inputs →Enter how your supplier sells and prices bulk material by the cubic yard.
Enter the quantity interval your supplier uses for bulk sales.
For example, a supplier may sell in 0.5 yd³ increments. This is only an example. Purchase Quantity rounds up to a whole selling increment.
Enter the actual price your supplier charges per cubic yard. No price is assumed.
Leave delivery blank if the cost is unknown. Confirm $0 only when your supplier has confirmed there is no delivery charge. Customer pickup means delivery does not apply; it is different from free delivery.
Enter only fees you have confirmed. Leave unknown fees blank, and confirm $0 or no additional fees only when that applies.
HOW MUCH TO ORDER
Purchase Quantity
yd³
Planning Volume is what your project needs. Purchase Quantity is what to order based on your supplier’s selling increments.
Add or check Supplier Selling Increment →Material Subtotal
USD
Delivery, additional fees and taxes are not included.
Add or check material price →USD
Material Subtotal plus confirmed delivery and fees. Taxes are not included. Confirm final pricing with your supplier; this is not a guaranteed final cost.
Review supplier costs →Use this sheet to review your measurements, quantities, supplier information and anything still needing confirmation.
PlanHousin / Gravel Project
Your current measurements, planning decisions and order details. Review any open items before ordering.
Cost: . Taxes are not included.
All calculation inputs are complete for this bulk-by-volume plan.
Bulk orders use a selling increment and price per cubic yard. Bags need the product’s yield per bag and bag price. This planner currently supports bulk by volume.
Finished depth describes the layer you want in place. Delivered material is loose, so the volumes are not automatically equivalent. Confirm any adjustment for your material and finished condition.
FROM MEASUREMENTS TO YOUR SUPPLIER
A cubic-yard result tells you how much space the gravel layer occupies. To plan an order, you also need your planning choices and your supplier’s selling terms. Here’s how those pieces fit together.
Return to Measure whenever you are ready to enter your project.
For a rectangular layer with uniform depth, multiply length by width by depth. Keep the units consistent: divide inches by 12 to get feet, then divide cubic feet by 27 to get cubic yards. Combined, those two conversions give:
Cubic yards = Length (ft) × Width (ft) × Depth (in) ÷ 324
A cubic yard is a unit of volume, not weight. The formula describes the measured space; it does not add extra material or round an order to a supplier’s selling increment.
Example inputs only — not your current project. Assume no extra allowance and no loose-to-finished adjustment.
If this example supplier sells in 0.5 yd³ increments, the purchase quantity rounds upward to 9.0 yd³. The increment is an example of supplier information, not a universal default. With different planning choices or selling increments, the order can change.
Allowance is material you deliberately choose to add beyond the measured requirement. Loose-to-finished addresses a different question: how much loose material corresponds to the finished layer you want. Confirm any factor for the specific material and condition with your supplier or the product documentation. Neither decision has a universal recommended percentage here.
The planner applies allowance before the loose-to-finished factor and keeps their origins visible. An exact calculation does not turn a planning assumption into supplier confirmation.
Weight requires density for the material in the relevant condition. Material type, particle-size distribution (gradation), moisture and how the material is placed can affect that relationship. FHWA’s discussion of material properties and moisture-density relationships explains why condition matters.
This version plans bulk purchases by volume. It does not calculate tons or bag counts, and it needs no density for that route. A future weight route will require valid, compatible density information instead of a silent generic conversion.
Use the short question card above as a conversation starter. Record the answers for the material you intend to buy, rather than borrowing terms from another supplier.
Material Subtotal uses Purchase Quantity and the supplier unit price you entered. Pre-tax Total adds resolved delivery and fees. Taxes are not included. Unknown charges remain questions, not automatic zeros, and a calculated total is not a supplier quote.
The sheet brings together your measurements, calculated quantities, planning choices, supplier information, confirmed costs and open questions. “Planning sheet — information to confirm” means that purchase information is still incomplete. “Purchase Quantity calculated from the information provided” means the quantity is ready based on your entries; costs may still need confirmation.
Before You Order identifies missing or invalid dependencies and links back to where you can resolve them. Review it with the supplier: the sheet is not an order confirmation, a supplier quote or an availability guarantee.
The calculation engine carries full internal precision through each step. Rounding shown on screen is for reading; later calculations use the internal value. Purchase rounding is a separate operation that rounds upward only after a valid selling increment is supplied.
Only the planning choices you make are applied. CALCULATED identifies a direct calculation; SUPPLIER-BASED identifies a dependency on supplier information; PLANNING ESTIMATE retains an explicit planning assumption. NEEDS INPUT names missing information, while CHECK INPUT asks you to correct a supplied value. Changing an input clears obsolete dependent results while preserving independent valid ones.
There is no hidden waste percentage, universal gravel density, automatic loose-to-finished factor, default supplier increment or default gravel price. Delivery and fees are not filled in automatically. The current interface supports one rectangular area and bulk ordering by volume; other shapes, multiple areas, tons and bags are outside this version.
Unit conversions follow the international foot and inch. NIST’s Guide to the SI, Appendix B.9 provides the length and volume conversion basis. The worked example above is checked against the same engine used by the planner.
Physical material properties are discussed in the linked FHWA reference. Those references do not certify a supplier’s material, selling terms or prices; obtain those details from your supplier.